Dogwood Meadows
Edgewood, WA
A 28 acre site in Edgewood's Town Center with 208 lots.

The Dogwood Meadow project is a challenge politically and logistically. Our firm worked with our client on an extensive developer agreement, sewer agreement, preliminary plat negotiations, community meetings, artistic exhibits, hearings and all other preliminary work to gain entitlements. The project also required conceptual storm and sewer designs, topographic and tree surveys, WSDOT right of way research and other services.
     
Gratzer Landing
Orting, WA
A 16.4 acre mixed use site with 106 condo units

A mixed use development in the City of Orting will be the first of its kind in this small town. Azure Green Consultants is currently working with the client to gain entitlements. The project contains commercial/retail, condominium, storage and other users. Azure Green is working with the City and its consultants on a Master Site Plan, Binding Site Plan, Developer Agreement, Design Standards, Architecture Review, SEPA processing, Engineering and other studies necessary for approval. The project is currently in the design and approval phase, with construction planned to start in 2008.
Azure Green Creative +graphic design +web +print +illustration - Copyright 2007, Azure Green Consultants, LLC.